If you do nondestructive testing (NDT) on ships, offshore structures or the steel that goes into them, sooner or later the question is not whether your work meets the code but whether it satisfies the class surveyor. On a vessel or unit classed with the American Bureau of Shipping (ABS), that surveyor works for ABS.
This guide covers how classification reaches NDT: class surveys and why their timing matters, what ABS and the other classification societies now expect of an NDT supplier and its people, what the surveyor witnesses, and the records to keep.
What classification is, and why NDT sits inside it
A classification society writes technical rules for the design, construction and upkeep of ships and offshore units, and surveys them against those rules. A vessel “in class” has been built to the rules and kept to them. Class is what owners, insurers, charterers and flag administrations lean on, so losing it is expensive in ways that have nothing to do with the NDT invoice.
NDT turns up at two points. During new construction and conversion, welds and structure are tested to the society's rules and guides, with the surveyor reviewing and often witnessing the work. In service, surveys call for examinations — thickness gauging, crack detection at known problem areas, testing of repairs — and the NDT supplier's report becomes part of the survey record.
Class surveys, and why a missed window matters
Class is kept through a cycle of periodic surveys — broadly, annual surveys, an intermediate survey, and a renewal (special) survey — plus occasional surveys after damage or repair. Each periodic survey falls due within a defined window around its due date. The details, and the consequences of missing a window, are in the society's rules for survey after construction.
For the NDT company, the window is the constraint that matters. A survey that needs gauging or crack testing cannot be credited until that work is done by acceptable personnel and reported in acceptable form. If a technician's certification lapses the week before the vessel comes in, or the surveyor will not accept the supplier, the survey slips — and a survey that slips past its window can put the vessel's class at risk. The client will remember whose paperwork held it up.
- DueA periodic survey falls due
- Annual, intermediate or renewal (special)
- Within a defined window around its due date
- TestThe NDT is done
- Thickness gauging, crack detection, testing of repairs
- By personnel the society accepts
- ReportA report in acceptable form
- Names the standard, procedure and acceptance criteria
- States a clear accept or reject
- ReviewThe surveyor decides
- Supplier, procedure, extent and results acceptable?
- May witness the test or check certificates on the spot
- CreditThe survey is credited
- The report joins the survey record
- A survey that slips past its window can put class at risk
Drawn from how this guide describes class surveys and the 2019 issue of IACS UR W35. Survey windows, extents of testing and acceptance criteria are in the current ABS Rules and Requirements for Nondestructive Testing, which this guide did not review for those.
The ABS NDT guide
ABS has long published a guide on the nondestructive inspection of hull welds, covering the methods (radiography, ultrasonic, magnetic particle and liquid penetrant), where and how much to test, and the acceptance criteria for hull and structural steel welds. The September 2020 edition retitled it simply the Guide for Nondestructive Inspection and added an appendix of requirements for NDT suppliers, following IACS UR W35. The January 2025 edition is titled Requirements for Nondestructive Testing. Treat any copy you have on file with suspicion until you have checked its date against the current edition.
IACS UR W35: the NDT supplier rules
ABS is one of the classification societies that make up the International Association of Classification Societies (IACS). IACS Unified Requirements are rules its member societies agree to apply uniformly, and UR W35, “Requirements for NDT Suppliers”, is the one that reaches NDT companies directly. The original issue is dated June 2019 and was to be implemented by IACS societies on or after 1 July 2020. It applies to firms providing NDT on ship and offshore structures and components subject to classification — both independent NDT companies and a yard's own NDT department.
What the 2019 issue asks of a supplier, in outline:
- Documents on request (section 2.1): the organization, the quality system and its procedures, operational procedures for each method, training programs, the procedure for the supervisor's authorisation of operators, equipment descriptions, record formats, and a list of operators' documented training, experience and certification. A company that certifies its own people must have a written practice built on a recognised standard, SNT-TC-1A or CP-189 being the examples given.
- A quality management system (2.2) covering, among other things, equipment calibration, training, certification and recertification of operators, a procedure for testing operators' visual acuity, traceable job records, record retention, corrective action and internal audits. A system meeting ISO/IEC 17020 and those points is considered acceptable.
- Personnel qualification (2.3): qualification, and preferably third-party certification, to a recognised scheme based on ISO 9712. An employer-based scheme such as SNT-TC-1A or CP-189 may be accepted if the society reviews the supplier's written practice and finds it acceptable, and that written practice must meet ISO 9712 at minimum, apart from the impartiality requirements that apply to a certification body. Level 3 personnel must be certified by an accredited certification body.
- A Level 3 supervisor (2.4): at least one, employed full time and independently certified to Level 3 in the methods concerned. An external, independently certified Level 3 may cover methods the in-house Level 3 does not hold. The supervisor reviews and accepts procedures and reports and re-evaluates each operator's qualification annually.
- Operators (2.5): whoever performs the test and interprets indications must be at least Level 2. Data gatherers who do not interpret may be Level 1.
- Reporting (2.9): reports must let the test be retraced or repeated, identify the defects found, state conclusively whether the item meets the acceptance criteria, and cite the standard, procedure and acceptance criteria applied.
| Role | Minimum | Clause |
|---|---|---|
| Performs the test and interprets indications | Level 2 in the method | 2.5 |
| Gathers data only, no interpretation | Level 1 | 2.5 |
| Supervisor | At least one full-time Level 3, certified by an accredited body | 2.4 |
| Operator qualification review by the supervisor | Annually | 2.4 |
| Level 3 certification | By an accredited certification body; may not be appointed | 2.3, 2.4 |
Our own summary of the 2019 issue. W35 has since been revised (Rev.1 2023, Rev.2 February 2025); check the current revision before relying on any row.
The numerals follow ISO 9712 — Level 1, 2 and 3 — because that is the scheme W35 is built on. If your people hold SNT-TC-1A certifications at Level I, II and III, the question to settle with the society before the job is whether your written practice has been reviewed and accepted. The comparison of personnel standards explains the difference between employer-based and central certification.
ABS's own Requirements for Nondestructive Testing (January 2025 edition, 1/5.9) ask the same: a technician's qualification is re-evaluated every year, by the supervisor on the employer's behalf.
What the surveyor witnesses
The surveyor does not perform the NDT, and does not certify your technicians. What the surveyor does is decide whether the testing satisfies the society's requirements: whether the supplier is acceptable, whether the procedure and extent of testing are right, whether the results support acceptance, and whether repairs have been retested. That can mean watching a test being done, reviewing radiographs or ultrasonic records, checking a technician's certificate on the spot, or asking for the supplier's approval documents.
Have ready, at the job and not back at the office:
- each technician's current certification for the method, and the vision exam behind it;
- the procedure you are working to, at its current revision, approved by your Level 3;
- calibration records for the equipment in use;
- your supplier approval, if the society requires one for the work;
- and reports that name the standard, procedure and acceptance criteria, and state a clear accept or reject.
Records to keep
UR W35 asks for records you can retrace: which operator tested what, when and where, to which procedure, with which calibrated equipment, and what was concluded. It leaves retention periods to the supplier's quality system, which should also reflect what the society and the client require. In practice, keep for each job the reports, the procedure revision used, the operators and their certifications at the time of the test, and the equipment and its calibration status — as they stood on the day, not as they stand now.
That last point is where paper files and shared drives fail. A certification renewed last month does not prove the technician was current two years ago when a weld was tested; the record from the day does. The digital inspection reports guide covers building reports that keep that snapshot, and the client portal guide covers letting a yard or owner see the certifications directly.
How TRACE handles it
TRACE tracks each technician's certifications with their method, level and due date, and can record a third-party certificate, such as one issued under ISO 9712, with its issuing body and number, beside employer certifications. Vision exams run on their own clock on any TRACE plan, and annual proficiency does with the People module, and reminders arrive before each date lapses rather than the week the vessel arrives.
With Projects, each job carries its field reports on your own form, written on the phone and approved in the office; the report PDF pulls in the job's equipment with its calibration standing at the time, and the specification line picks the procedure at its current revision from your NDT program register. A client portal login lets a client whose NDT program you run see its own technicians, certifications and documents, and nothing of anyone else's. TRACE keeps the records; acceptance of a supplier, a technician or a result is the classification society's decision.
Frequently asked questions
Does ABS accept SNT-TC-1A certified technicians?
It can, but check first. Under the original 2019 issue of IACS UR W35, which ABS and the other IACS societies apply to NDT suppliers, qualification to an ISO 9712-based scheme is preferred, and an employer-based scheme such as SNT-TC-1A or CP-189 may be accepted if the society reviews the supplier's written practice and finds it acceptable. That written practice has to meet ISO 9712 at minimum, apart from the certification-body impartiality rules. W35 has since been revised, so confirm against the current revision and the current ABS Guide.
What level must an NDT technician be for ABS work?
Under the 2019 issue of UR W35, the person carrying out the test and interpreting indications must be at least Level 2 in the method. Someone who only gathers data, without interpreting or analyzing it, may be Level 1. The supplier must also employ, full time, at least one supervisor independently certified to Level 3 by an accredited certification body.
What is IACS UR W35?
A Unified Requirement from the International Association of Classification Societies setting requirements for firms that provide NDT on ships and offshore structures subject to classification: documented procedures, a quality management system, qualified and certified personnel, a Level 3 supervisor, suitable equipment and traceable reports. The original issue was to be implemented by IACS societies on or after 1 July 2020.
Where do I get the ABS NDT guide?
ABS publishes its Rules and Guides free of charge on its own website. Download the current edition there rather than relying on an old PDF, because the document has been retitled and revised more than once: the Guide for Nondestructive Inspection of Hull Welds became the Guide for Nondestructive Inspection in 2020, and the January 2025 edition is titled Requirements for Nondestructive Testing.
Checked against
- IACS Unified Requirement W35, Requirements for NDT Suppliers, original issue June 2019 (implemented by IACS societies on or after 1 July 2020). Revision 1 (2023) and Revision 2 (February 2025) have since been issued and were not reviewed
- ABS Requirements for Nondestructive Testing, January 2025 edition, Section 1/5.9 (Supervisor): the annual re-evaluation of operators' qualification
- The same document's Foreword (2025), for its edition and title history (the Guide for Nondestructive Inspection of Hull Welds until 2020, then the Guide for Nondestructive Inspection); its methods, extents of testing and acceptance criteria were not reviewed and are described in outline only
- ABS Rules for classification and survey: not reviewed; described in outline only
This guide summarises the documents above in our own words to help you find your way around them. It is not a substitute for them: requirements change between editions and contracts add their own, so check every figure against your own licensed copy and your written practice before you rely on it.
Named for reference only. TRACE is an independent product: it is not affiliated with, endorsed by, sponsored by or accredited by the American Bureau of Shipping (ABS), the International Association of Classification Societies (IACS), ISO or ASNT (publisher of SNT-TC-1A and CP-189), or by any other organization whose standards or programs it describes. Their names and marks are their own.